Kansas City International Airport Construction Layout
Kansas City, Missouri
PROJECT OWNER:
Kansas City Aviation Department
SURVEY PROJECT:
2019-2023
SERVICES:
Construction Layout
Project Overview
Description
Midland Surveying completed the construction layout for multiple sub-contractors on this project and consisted of establishing site control for the layout of all phases of the project. Layout consisted of site grading for sub-grade, electrical layout for light poles, can lights, call stations, and electric car charging stations—pavement layout for parking lots and sidewalks. Layout was also completed for signage, fencing, and safety bollards.
A project this size has multiple firms working on the design for construction. Drawings were updated often, and Midland Surveying staff worked with multiple people to ensure the drawings downloaded from CWC JV FIELDWIRE were current and to be sure the latest drawings were utilized for the layout.